Kanaka Durga Temple Flyover Industrial Visit
Visited : Kanaka Durga Temple Flyover Industrial Visit
Date : 2-1-2017
Branch : Diploma in Civil Engineering
No. of Students : 30
Permission Obtained : Deputy General Manager, Soma Enterprise Ltd, vijayawada
Faculty Cordinators :
- T. Mahesh Kumar
- V. Ajay Kumar
- Ch. Soundarya
Description of Company :
Soma Enterprise Ltd. Is one of the fastest growing infrastructure developers in India focused on construction and development of core infrastructure projects in the transportation, hydel power and water resource sectors among others.
According to information Soma Constructions bagged the contract. The firm quoted Rs.282 crore for the project, and the works are started. The total cost of the project is estimated at Rs 447.8 crore
Project Details
- The bridge is expected to be a 6 lane flyover and it is starts from Bhavanipuram Indian oil petrol bunk and its ends at vaaradhi
- The total length of flyover is 2.5 Km and it contains a 45 piers and two abutments
- The diameter of the pile is 1.2 m and height is 36-42 m. the height of the pile cap is 1.5 m height and 2 m width and the width of the pile foundation for 9 piles is 11 m and wide is 5.7 m
- They can use the pot bearing type in the structure it is so reflective the loads for the moveable loads.